Small IPPs (Independent Power Producers) who can afford small investment to start their businesses. Those who need power sources fast track Those who are not connected to the national grid Places where it difficult to have infrastructure(e.g. high voltage transmissions line) Small towns and isolated areas
All the process of manufacturing, transportation, installation, and commissioning for a 80 MW takes just few months.
Reinstallation of 1 PPS unit takes just 2 weeks. Even with more units, no additional time is required.
30-70% lower operation cost compared to high speed gensets.
The smart control system gives easy & efficient site operation for O&M managers.
1.Containerizing
2.Loading
3.Shipping
4.On Site Delivery
The PPS can be installed in a 40 feet container, so it can be stacked on containerships at sea and be easily carried by trailers on land.